Datasets:
GIZ
/

question
stringlengths
58
131
QuestionText
stringlengths
7
54
context
stringlengths
72
1.68k
Sector
stringclasses
19 values
Country
stringlengths
4
32
answers
dict
Document
stringclasses
4 values
Alpha3
stringlengths
3
3
SubSector
stringlengths
3
91
split
stringclasses
3 values
Question_Definition
stringlengths
10
78
id
stringlengths
1
5
What are the Adaptation action/priority for the Cross-Cutting Area Sector?
Action and priority
Enhance the established enabling legal, policy and institutional environment for a low carbon emission development pathway to achieve poverty reduction and sustainable development. By 2020, update the Building Code to meet projected impacts of climate change. Support for Implementation.
Cross-Cutting Area
Antigua and Barbuda
{ "answer_start": [ 26 ], "text": [ "2020, update the building code to meet projected impacts of climate change" ] }
First NDC
ATG
Climate risk management
train
Adaptation action/priority
300
What is the time frame for the implementation of plans or achieving target/objectives ?
Time frame
↩. The CARIBSAVE Partnership, 2012. The CARIBSAVE Climate Change Risk Atlas (CCCRA): Climate Change Risk Profile for Antigua and Barbuda. Prepared with funding from DFID and AusAID, p. 14. ↩. The CARIBSAVE Partnership, 2012. Climate Change Risk Profile for Antigua and Barbuda, p. 36.; Environment Solutions Limited (ESL), 2014.
Cross-Cutting Area
Antigua and Barbuda
{ "answer_start": [ 10, 45 ], "text": [ "climate change risk atlas (cccra): climate change risk", "climate change risk" ] }
First NDC
ATG
Climate risk management
train
Time frame
301
Which subsector forms part of global climate change adaptation subsector in Cross-Cutting Area Sector ?
Adapt Now subsector
↩. The CARIBSAVE Partnership, 2012. The CARIBSAVE Climate Change Risk Atlas (CCCRA): Climate Change Risk Profile for Antigua and Barbuda. Prepared with funding from DFID and AusAID, p. 14. ↩. The CARIBSAVE Partnership, 2012. Climate Change Risk Profile for Antigua and Barbuda, p. 36.; Environment Solutions Limited (ESL), 2014.
Cross-Cutting Area
Antigua and Barbuda
{ "answer_start": [ 10, 45 ], "text": [ "climate change risk atlas (cccra): climate change risk", "climate change risk" ] }
First NDC
ATG
Climate risk management
train
GCA_subsector
302
What are the Adaptation action/priority for the Disaster Risk Management (DRM) Sector?
Action and priority
[12] Physical infrastructure in Antigua and Barbuda must be adapted to the dynamic threats of water scarcity, heavy rainfall events, and more intense storms and hurricanes. By 2030, all buildings will be improved and prepared for extreme climate events, including drought, flooding and hurricanes.
Disaster Risk Management (DRM)
Antigua and Barbuda
{ "answer_start": [ 29 ], "text": [ "hurricanes. by 2030, all buildings will be improved and prepared for extreme climate events, including drought, flooding and hurricanes" ] }
First NDC
ATG
Disaster preparedness
train
Adaptation action/priority
303
Which subsector forms part of global climate change adaptation subsector in Disaster Risk Management (DRM) Sector ?
Adapt Now subsector
↩. The CARIBSAVE Partnership, 2012. The CARIBSAVE Climate Change Risk Atlas (CCCRA): Climate Change Risk Profile for Antigua and Barbuda. Prepared with funding from DFID and AusAID, p. 14. ↩. The CARIBSAVE Partnership, 2012. Climate Change Risk Profile for Antigua and Barbuda, p. 36.; Environment Solutions Limited (ESL), 2014.
Disaster Risk Management (DRM)
Antigua and Barbuda
{ "answer_start": [ 10, 45 ], "text": [ "climate change risk atlas (cccra): climate change risk", "climate change risk" ] }
First NDC
ATG
Disaster preparedness
train
GCA_subsector
304
What are the Adaptation action/priority for the Energy Sector?
Action and priority
By 2030, 100% of electricity demand in the water sector [1] and other essential services (including health, food storage and emergency services) will be met through off‐grid renewable sources. By 2030, all waterways are protected to reduce the risks of flooding and health impacts.
Energy
Antigua and Barbuda
{ "answer_start": [ 1, 47 ], "text": [ "2030, 100% of electricity demand in the water sector [1] and other essential services (including health, food storage and emergency services) will be met through off‐grid renewable sources. by 2030", "risks of flooding and health" ] }
First NDC
ATG
Renewable energy
train
Adaptation action/priority
305
What is the time frame for the implementation of plans or achieving target/objectives ?
Time frame
↩. The CARIBSAVE Partnership, 2012. The CARIBSAVE Climate Change Risk Atlas (CCCRA): Climate Change Risk Profile for Antigua and Barbuda. Prepared with funding from DFID and AusAID, p. 14. ↩. The CARIBSAVE Partnership, 2012. Climate Change Risk Profile for Antigua and Barbuda, p. 36.; Environment Solutions Limited (ESL), 2014.
Energy
Antigua and Barbuda
{ "answer_start": [ 10, 45 ], "text": [ "climate change risk atlas (cccra): climate change risk", "climate change risk" ] }
First NDC
ATG
Renewable energy
train
Time frame
306
What are the Adaptation action/priority for the Environment Sector?
Action and priority
By 2030, 100% of electricity demand in the water sector [1] and other essential services (including health, food storage and emergency services) will be met through off‐grid renewable sources. By 2030, all waterways are protected to reduce the risks of flooding and health impacts.
Environment
Antigua and Barbuda
{ "answer_start": [ 38 ], "text": [ "2030, all waterways are protected to reduce the risks of flooding and health impacts" ] }
First NDC
ATG
Watershed and river basin management
train
Adaptation action/priority
307
What are the Adaptation action/priority for the Water Sector?
Action and priority
Antigua and Barbuda reserves the right to revise this INDC prior to finalization and/or ratification under a new global climate agreement. Intended Nationally Determined Contribution (INDC). Conditional Adaptation Targets. By 2025, increase seawater desalination capacity by 50% above 2015 levels.
Water
Antigua and Barbuda
{ "answer_start": [ 30 ], "text": [ "conditional adaptation targets. by 2025, increase seawater desalination capacity by 50% above 2015 levels" ] }
First NDC
ATG
Water supply
train
Adaptation action/priority
308
What is the time frame for the implementation of plans or achieving target/objectives ?
Time frame
In March 2013, Antigua and Barbuda released a Sustainable Energy Action Plan (SEAP), to foster energy conservation and efficiency, diversification of energy sources, sustainable energy consumption and generation as well as the utilization of renewable energy sources. In 2015, Parliament enacted the Renewable Energy Act of 2015, to establish a legal, economic and institutional basis to promote the use of renewable energy resources.
Water
Antigua and Barbuda
{ "answer_start": [ 26, 70 ], "text": [ "energy sources, sustainable energy", "renewable energy" ] }
First NDC
ATG
Water supply
train
Time frame
309
Which subsector forms part of global climate change adaptation subsector in Water Sector ?
Adapt Now subsector
The water sector includes water generation (seawater desalination), distribution and usage, to ensure water delivery when grid electricity may be interrupted. Based on an informal assessment, water distribution and usage is equal to approximately 15% of GHG emissions in the electricity sector. ↩.
Water
Antigua and Barbuda
{ "answer_start": [ 1 ], "text": [ "water sector includes water" ] }
First NDC
ATG
Water supply
test
GCA_subsector
310
What are the Existing upstream policies that are incorporated in the Energy Sector ?
Existing sectoral policies
In March 2013, Antigua and Barbuda released a Sustainable Energy Action Plan (SEAP), to foster energy conservation and efficiency, diversification of energy sources, sustainable energy consumption and generation as well as the utilization of renewable energy sources. In 2015, Parliament enacted the Renewable Energy Act of 2015, to establish a legal, economic and institutional basis to promote the use of renewable energy resources.
Energy
Antigua and Barbuda
{ "answer_start": [ 9, 26, 40, 70 ], "text": [ "sustainable energy action plan", "energy sources, sustainable energy", "renewable energy sources. in 2015, parliament enacted the renewable energy act of 2015", "renewable energy" ] }
First NDC
ATG
Renewable Energy
train
Information on the existing upstream sectoral policies that the NDC builds on
311
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ?
Sectoral targets on
In 2015, Parliament enacted the Renewable Energy Act of 2015, to establish a legal, economic and institutional basis to promote the use of renewable energy resources. Towards this end, Antigua and Barbuda will, by 2030, achieve an energy matrix with 50 MW of electricity from renewable sources both on and off-grid in the public and private sectors.
Energy
Antigua and Barbuda
{ "answer_start": [ 40 ], "text": [ "2030, achieve an energy matrix with 50 mw of electricity from renewable sources" ] }
First NDC
ATG
Renewable Energy
train
Targets at the sectoral level
312
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ?
Conditional part of mitigation target
In 2015, Parliament enacted the Renewable Energy Act of 2015, to establish a legal, economic and institutional basis to promote the use of renewable energy resources. Towards this end, Antigua and Barbuda will, by 2030, achieve an energy matrix with 50 MW of electricity from renewable sources both on and off-grid in the public and private sectors.
Energy
Antigua and Barbuda
{ "answer_start": [ 40 ], "text": [ "2030, achieve an energy matrix with 50 mw of electricity from renewable sources" ] }
First NDC
ATG
Renewable Energy
val
Conditional part of the mitigation target for a given sectoral target
313
What is the conditional part of mitigation target provided for the Energy Sector ?
Conditional part of mitigation target
In March 2013, Antigua and Barbuda released a Sustainable Energy Action Plan (SEAP), to foster energy conservation and efficiency, diversification of energy sources, sustainable energy consumption and generation as well as the utilization of renewable energy sources. In 2015, Parliament enacted the Renewable Energy Act of 2015, to establish a legal, economic and institutional basis to promote the use of renewable energy resources.
Energy
Antigua and Barbuda
{ "answer_start": [ 19 ], "text": [ "energy conservation and efficiency, diversification of energy sources, sustainable energy consumption" ] }
First NDC
ATG
Supply-side Efficiency: Power generation efficiency improvement
train
Conditional part of mitigation target for a given sectoral plan
314
What plans and strategies are mentioned pertaining to Energy Sector ?
Sectoral plans on
In March 2013, Antigua and Barbuda released a Sustainable Energy Action Plan (SEAP), to foster energy conservation and efficiency, diversification of energy sources, sustainable energy consumption and generation as well as the utilization of renewable energy sources. In 2015, Parliament enacted the Renewable Energy Act of 2015, to establish a legal, economic and institutional basis to promote the use of renewable energy resources.
Energy
Antigua and Barbuda
{ "answer_start": [ 19 ], "text": [ "energy conservation and efficiency, diversification of energy sources, sustainable energy consumption" ] }
First NDC
ATG
Supply-side Efficiency: Power generation efficiency improvement
val
Information on sectoral plans
315
What is the conditional part of mitigation target provided for the LULUCF/Forestry Sector ?
Conditional part of mitigation target
By 2030, achieve an energy matrix with 50 MW of electricity from renewable sources both on and off‐grid in the public and private sectors.[3]. By 2030, all remaining wetlands and watershed areas with carbon sequestration potential are protected as carbon sinks. Unconditional Targets.
LULUCF/Forestry
Antigua and Barbuda
{ "answer_start": [ 32 ], "text": [ "wetlands and watershed areas with carbon sequestration potential are protected as carbon sinks" ] }
First NDC
ATG
Wetlands
train
Conditional part of mitigation target for a given sectoral plan
316
What plans and strategies are mentioned pertaining to LULUCF/Forestry Sector ?
Sectoral plans on
By 2030, achieve an energy matrix with 50 MW of electricity from renewable sources both on and off‐grid in the public and private sectors.[3]. By 2030, all remaining wetlands and watershed areas with carbon sequestration potential are protected as carbon sinks. Unconditional Targets.
LULUCF/Forestry
Antigua and Barbuda
{ "answer_start": [ 32 ], "text": [ "wetlands and watershed areas with carbon sequestration potential are protected as carbon sinks" ] }
First NDC
ATG
Wetlands
train
Information on sectoral plans
317
What is the conditional part of mitigation target provided for upstream plans and strategies in the Transport Sector ?
Conditional part of mitigation target
By 2030, an affordable insurance scheme is available for farmers, fishers, and residential and business owners to cope with losses resulting from climate variability. Conditional Mitigation Targets. By 2020, establish efficiency standards for the importation of all vehicles and appliances. By 2020, finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant by 2025.[2].
Transport
Antigua and Barbuda
{ "answer_start": [ 33, 45 ], "text": [ "2020, establish efficiency standards", "appliances. by 2020" ] }
First NDC
ATG
Vehicle Fleet
train
Conditional part of mitigation target for a given sectoral upstream policy
318
What upstream policies and strategies are mentioned in Transport Sector ?
Upstream policies on
By 2030, an affordable insurance scheme is available for farmers, fishers, and residential and business owners to cope with losses resulting from climate variability. Conditional Mitigation Targets. By 2020, establish efficiency standards for the importation of all vehicles and appliances. By 2020, finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant by 2025.[2].
Transport
Antigua and Barbuda
{ "answer_start": [ 33, 45 ], "text": [ "2020, establish efficiency standards", "appliances. by 2020" ] }
First NDC
ATG
Vehicle Fleet
val
Information on upstream policies for a given sector
319
What are the downstream actions that are incorporated in the Waste Sector as part of Nationally Determined Contributions?
Downstream actions
By 2020, finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant by 2025.[2]. By 2030, achieve an energy matrix with 50 MW of electricity from renewable sources both on and off‐grid in the public and private sectors.[3].
Waste
Antigua and Barbuda
{ "answer_start": [ 3, 15 ], "text": [ "finalize the technical studies", "waste to energy (wte) plant" ] }
First NDC
ATG
Waste-to-Energy
train
Sectoral downstream actions to be undertaken as part of the NDC contribution
320
What is the conditional part of mitigation target provided for the Waste Sector ?
Conditional part of mitigation target
By 2020, finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant by 2025.[2]. By 2030, achieve an energy matrix with 50 MW of electricity from renewable sources both on and off‐grid in the public and private sectors.[3].
Waste
Antigua and Barbuda
{ "answer_start": [ 15 ], "text": [ "waste to energy (wte) plant" ] }
First NDC
ATG
Waste-to-Energy
train
Conditional part of mitigation target for a given sectoral plan
321
What plans and strategies are mentioned pertaining to Waste Sector ?
Sectoral plans on
A preliminary review of annual waste streams to the sanitary landfill suggests that some 80,000 tonnes annually of feedstock could be available for conversion to energy if an appropriate facility were available, mitigating CO2, N2O and CH4 emissions. Antigua and Barbuda’s goal is to, by 2020, finalize technical studies with the intention to construct and operationalize a waste to energy (WTE) plant by 2025.
Waste
Antigua and Barbuda
{ "answer_start": [ 63 ], "text": [ "waste to energy (wte) plant" ] }
First NDC
ATG
Waste-to-Energy
val
Information on sectoral plans
322
What are the Adaptation action/priority for the Cross-Cutting Area Sector?
Action and priority
Given the country’s exposure and vulnerability, Antigua and Barbuda has proposed the implementation of gender-responsive national schemes that will offer risk management tools, such as parametric or indemnity insurance, that will allow farmers, fishers, residential and commercial business owners to cope with losses resulting from increased climate variability. The proposed schemes are in line with the loss and damage action of: Farmers, fishers, and residential and business owners have access to comprehensive and tailored national programmes that allow them to affordably manage and transfer risks resulting from increasing climate variability.
Cross-Cutting Area
Antigua and Barbuda
{ "answer_start": [ 33, 97 ], "text": [ "insurance, that will allow farmers, fishers, residential and commercial business owners to cope with losses resulting from increased climate variability. the proposed schemes are in line with the loss and damage action of: farmers, fishers, and residential and business owners", "resulting from increasing climate variability" ] }
First NDC
ATG
Climate risk management
val
Adaptation action/priority
323
What is the time frame for the implementation of plans or achieving target/objectives ?
Time frame
Note: These targets are in addition to the 2030 targets set in the INDC. Table 1: Targets to be achieved by 2030. Thematic Area. Target and Actions. Completion Date. Year Communicated. Conditionality. NDC Targets. Mitigation. 1. 86% renewable energy generation from local resources in the electricity sector. 2030. 2021. Conditional.
Cross-Cutting Area
Antigua and Barbuda
{ "answer_start": [ 24 ], "text": [ "2030. thematic area" ] }
First NDC
ATG
Climate risk management
train
Time frame
324
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector
c. Other contextual aspirations and priorities acknowledged when joining the Paris Agreement;. Adopting a cross-cutting approach to resilience building that include the energy sector as a key adaptation approach. Technology for the transition: Antigua and Barbuda understands that access to technology is key barrier to a successful transition.
Cross-Cutting Area
Antigua and Barbuda
{ "answer_start": [ 16 ], "text": [ "cross-cutting" ] }
First NDC
ATG
Climate risk management
train
GCA_Sector
325
Which subsector forms part of global climate change adaptation subsector in Cross-Cutting Area Sector ?
Adapt Now subsector
Extension Division. Fisheries Division. Ministry of Finance and Corporate Governance. Financial Service Regulatory Commission. Ministry of Health, Wellness, and The Environment. Insurance Sector Stakeholders. AM Insurance Agency Ltd. Anjo Insurance. Caribbean Alliance Insurance. Gallagher Brokers. Island Heritage Insurance. Kenneth A. Gomez and Sons. Kelsick Insurance Agency. Massy United Insurance. Sagicor.
Cross-Cutting Area
Antigua and Barbuda
{ "answer_start": [ 28, 58 ], "text": [ "insurance sector stakeholders. am insurance agency ltd. anjo insurance. caribbean alliance insurance", "insurance agency. massy united insurance" ] }
First NDC
ATG
Climate risk management
train
GCA_subsector
326
What are the Adaptation action/priority for the Cross-Cutting Area Sector?
Action and priority
With the increased frequency of droughts because of climate change, there is need for an integrated approach to use available best practises for water generation, water capture, distribution, storage, and reuse, while respecting the natural balance of water needs for the forest and natural ecosystem systems and sectors such as farming. The project is to ensure consistent water supply for the people of Antigua and Barbuda. Green Climate Fund.
Cross-Cutting Area
Antigua and Barbuda
{ "answer_start": [ 24, 59 ], "text": [ "water generation, water", "project is to ensure consistent water" ] }
First NDC
ATG
Climate risk management
train
Adaptation action/priority
327
What is the time frame for the implementation of plans or achieving target/objectives ?
Time frame
c. Other contextual aspirations and priorities acknowledged when joining the Paris Agreement;. Adopting a cross-cutting approach to resilience building that include the energy sector as a key adaptation approach. Technology for the transition: Antigua and Barbuda understands that access to technology is key barrier to a successful transition.
Cross-Cutting Area
Antigua and Barbuda
{ "answer_start": [ 16 ], "text": [ "cross-cutting" ] }
First NDC
ATG
Climate risk management
test
Time frame
328
Which subsector forms part of global climate change adaptation subsector in Cross-Cutting Area Sector ?
Adapt Now subsector
Managing remaining extreme weather risk to climate-vulnerable livelihoods and food security by building the financial resilience of vulnerable households to climate shocks. Financial climate resilience will be achieved through the development and implementation of sustainable ex ante risk financing, including the design and deployment of novel risk financing products through a pilot livelihood protection programme, catalysing private sector investment into additional sustainable risk financing products for the fisheries and agricultural sectors to further support livelihood security under future climate change conditions.
Cross-Cutting Area
Antigua and Barbuda
{ "answer_start": [ 4, 22, 40 ], "text": [ "risk to climate", "climate shocks. financial climate", "risk financing, including the design and deployment of novel risk" ] }
First NDC
ATG
Climate risk management
train
GCA_subsector
329
What are the Adaptation action/priority for the Disaster Risk Management (DRM) Sector?
Action and priority
climate-proofing identified public buildings to improve resilience to extreme climate events — including tropical storms, hurricanes, droughts and extended dry periods, floods, and rising air temperatures — and improve adaptation interventions during such events. developing and implementing plans for climate-proofing activities and interventions in critical service buildings. Global Environmental Facility.
Disaster Risk Management (DRM)
Antigua and Barbuda
{ "answer_start": [ 7, 34 ], "text": [ "improve resilience to extreme climate events — including tropical storms, hurricanes, droughts", "improve adaptation interventions during such events" ] }
First NDC
ATG
Disaster preparedness
val
Adaptation action/priority
330
What are the Adaptation action/priority for the Energy Sector?
Action and priority
100% education, health, food security, and emergency shelter facilities powered by their own grid-interactive renewable energy sources. 2030. 2015 (Updated in 2021). Conditional. 9.
Energy
Antigua and Barbuda
{ "answer_start": [ 0, 17 ], "text": [ "100% education, health, food security, and emergency", "grid-interactive renewable energy sources. 2030" ] }
First NDC
ATG
Renewable energy
train
Adaptation action/priority
331
What are the Adaptation action/priority for the Environment Sector?
Action and priority
All waterways are protected to reduce the risks of flooding and health impacts. 2030. 2015. Conditional. Targets to support social inclusion, gender and reduce transitional risks. Just Transition. 12.
Environment
Antigua and Barbuda
{ "answer_start": [ 1, 28 ], "text": [ "waterways are protected to reduce the risks of flooding and health impacts. 2030", "reduce transitional risks" ] }
First NDC
ATG
Watershed and river basin management
train
Adaptation action/priority
332
Which subsector forms part of global climate change adaptation subsector in Environment Sector ?
Adapt Now subsector
Adaptation planning at the Local Area Planning (LAP) scale (i.e., community and parish level), as well will help the GoAB understand the spatial distribution and quantification of catastrophe risk in a changing climate at a local scale. The GoAB also intends to implement regulations, which recognise the need for the integration of risk information into the adaptation planning framework.
Environment
Antigua and Barbuda
{ "answer_start": [ 37 ], "text": [ "changing climate" ] }
First NDC
ATG
Watershed and river basin management
val
GCA_subsector
333
What are the Adaptation action/priority for the Water Sector?
Action and priority
Conditional. 2. Electricity. a) 100 MW of renewable energy generation capacity available to the grid. 2030. 2015 (Updated in 2021). Conditional. b) 50 MW of renewable energy generation capacity owned by farmers who can sell electricity to off-takers.
Water
Antigua and Barbuda
{ "answer_start": [ 0, 11, 29 ], "text": [ "conditional. 2", "renewable energy generation capacity", "conditional. b) 50 mw of renewable energy generation capacity" ] }
First NDC
ATG
Water supply
train
Adaptation action/priority
334
What is the time frame for the implementation of plans or achieving target/objectives ?
Time frame
Building Code updated and passed into law in line with a climate resilient development pathway including, inter alia, a requirement that all new homes built after 2025 have back-up renewable energy generation and storage systems. 2025. 2015 (Updated in 2021). Conditional. 7. 100% of the water supply infrastructure powered by their own grid-interactive renewable energy sources.
Water
Antigua and Barbuda
{ "answer_start": [ 28, 67 ], "text": [ "2025 have back-up renewable energy generation and storage systems. 2025", "renewable energy" ] }
First NDC
ATG
Water supply
test
Time frame
335
Which subsector forms part of global climate change adaptation subsector in Water Sector ?
Adapt Now subsector
With the increased frequency of droughts because of climate change, there is need for an integrated approach to use available best practises for water generation, water capture, distribution, storage, and reuse, while respecting the natural balance of water needs for the forest and natural ecosystem systems and sectors such as farming. The project is to ensure consistent water supply for the people of Antigua and Barbuda.
Water
Antigua and Barbuda
{ "answer_start": [ 24 ], "text": [ "water generation, water" ] }
First NDC
ATG
Water supply
train
GCA_subsector
336
What are the Existing upstream policies that are incorporated in the Energy Sector ?
Existing sectoral policies
This enabling environment includes the enactment of the Renewable Energy Act of 2015 and the Environmental Protection and Management Act (EPMA) of 20194 which included provisions for the formation of the Sustainable Island Resource Framework Fund (SIRF Fund). The updating of the Country’s Building Code, in addition to policies in energy and the environment such as the National Energy Policy5 and the Sustainable Energy Action Plan.6.
Energy
Antigua and Barbuda
{ "answer_start": [ 8, 55, 64 ], "text": [ "renewable energy act of 2015", "policies in energy", "national energy policy5 and the sustainable energy action" ] }
First NDC
ATG
Renewable Energy
test
Information on the existing upstream sectoral policies that the NDC builds on
337
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ?
Sectoral targets on
Conditional. 2. Electricity. a) 100 MW of renewable energy generation capacity available to the grid. 2030. 2015 (Updated in 2021). Conditional. b) 50 MW of renewable energy generation capacity owned by farmers who can sell electricity to off-takers.
Energy
Antigua and Barbuda
{ "answer_start": [ 4, 33 ], "text": [ "electricity. a) 100 mw of renewable energy", "50 mw of renewable energy" ] }
First NDC
ATG
Renewable Energy
train
Targets at the sectoral level
338
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ?
Conditional part of mitigation target
Conditional. 2. Electricity. a) 100 MW of renewable energy generation capacity available to the grid. 2030. 2015 (Updated in 2021). Conditional. b) 50 MW of renewable energy generation capacity owned by farmers who can sell electricity to off-takers.
Energy
Antigua and Barbuda
{ "answer_start": [ 4, 33 ], "text": [ "electricity. a) 100 mw of renewable energy", "50 mw of renewable energy" ] }
First NDC
ATG
Renewable Energy
train
Conditional part of the mitigation target for a given sectoral target
339
What is the conditional part of mitigation target provided for the Energy Sector ?
Conditional part of mitigation target
developing and implementing plans for climate-proofing activities and interventions in critical service buildings. Global Environmental Facility. Approved. 21. Sustainable Energy Facility. Reduce the dependency on fossil fuels by promoting the implementation of Energy Efficiency (EE) measures and RE pilot demonstration projects and solutions, including through promotion of Smart Grid solutions, to reduce energy consumption and costs.
Energy
Antigua and Barbuda
{ "answer_start": [ 63 ], "text": [ "energy consumption" ] }
First NDC
ATG
Supply-side Efficiency: Power generation efficiency improvement
train
Conditional part of mitigation target for a given sectoral plan
340
What plans and strategies are mentioned pertaining to Energy Sector ?
Sectoral plans on
developing and implementing plans for climate-proofing activities and interventions in critical service buildings. Global Environmental Facility. Approved. 21. Sustainable Energy Facility. Reduce the dependency on fossil fuels by promoting the implementation of Energy Efficiency (EE) measures and RE pilot demonstration projects and solutions, including through promotion of Smart Grid solutions, to reduce energy consumption and costs.
Energy
Antigua and Barbuda
{ "answer_start": [ 63 ], "text": [ "energy consumption" ] }
First NDC
ATG
Supply-side Efficiency: Power generation efficiency improvement
val
Information on sectoral plans
341
What is the conditional part of mitigation target provided for the LULUCF/Forestry Sector ?
Conditional part of mitigation target
4. Waste. a) Circular economy policy and regulations agreed on. 2025. 2021. Conditional. 5. Agriculture, Forestry and Other Land Use. a) All remaining wetlands, watershed areas, and seagrass bed areas with carbon sequestration potential are protected as carbon sinks. 2030. 2015. (Updated in 2021). Conditional. Adaptation2. 6.
LULUCF/Forestry
Antigua and Barbuda
{ "answer_start": [ 44 ], "text": [ "carbon sequestration potential are protected as carbon sinks" ] }
First NDC
ATG
Wetlands
train
Conditional part of mitigation target for a given sectoral plan
342
What plans and strategies are mentioned pertaining to LULUCF/Forestry Sector ?
Sectoral plans on
4. Waste. a) Circular economy policy and regulations agreed on. 2025. 2021. Conditional. 5. Agriculture, Forestry and Other Land Use. a) All remaining wetlands, watershed areas, and seagrass bed areas with carbon sequestration potential are protected as carbon sinks. 2030. 2015. (Updated in 2021). Conditional. Adaptation2. 6.
LULUCF/Forestry
Antigua and Barbuda
{ "answer_start": [ 44 ], "text": [ "carbon sequestration potential are protected as carbon sinks" ] }
First NDC
ATG
Wetlands
train
Information on sectoral plans
343
What is the conditional part of mitigation target provided for upstream plans and strategies in the Transport Sector ?
Conditional part of mitigation target
a) Enhance the established enabling legal, policy and institutional environment for a low carbon emission development pathway to achieve poverty reduction and sustainable development. None. 2015. Unconditional. b) Establish efficiency standards for the importation of all appliances. 2020. 2015. Conditional.
Transport
Antigua and Barbuda
{ "answer_start": [ 36 ], "text": [ "efficiency standards for the importation of all appliances. 2020" ] }
First NDC
ATG
Vehicle Fleet
train
Conditional part of mitigation target for a given sectoral upstream policy
344
What upstream policies and strategies are mentioned in Transport Sector ?
Upstream policies on
a) Enhance the established enabling legal, policy and institutional environment for a low carbon emission development pathway to achieve poverty reduction and sustainable development. None. 2015. Unconditional. b) Establish efficiency standards for the importation of all appliances. 2020. 2015. Conditional.
Transport
Antigua and Barbuda
{ "answer_start": [ 36 ], "text": [ "efficiency standards for the importation of all appliances. 2020" ] }
First NDC
ATG
Vehicle Fleet
train
Information on upstream policies for a given sector
345
What are the downstream actions that are incorporated in the Waste Sector as part of Nationally Determined Contributions?
Downstream actions
2030. h) Finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant. 2025. 2015. Conditional. 3. Transport. a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional.
Waste
Antigua and Barbuda
{ "answer_start": [ 4, 16 ], "text": [ "finalize the technical studies", "waste to energy (wte) plant. 2025" ] }
First NDC
ATG
Waste-to-Energy
train
Sectoral downstream actions to be undertaken as part of the NDC contribution
346
What is the conditional part of mitigation target provided for the Waste Sector ?
Conditional part of mitigation target
While the first NDC had a waste sector target of completing technical studies for a waste to energy (WTE) plant, due to shifts in the sector, the DOE will be undertaking technical studies to assess the feasibility of a WTE plant. The updated NDC includes a waste sector target to develop a circular economy policy and regulations.
Waste
Antigua and Barbuda
{ "answer_start": [ 15 ], "text": [ "waste to energy (wte) plant" ] }
First NDC
ATG
Waste-to-Energy
train
Conditional part of mitigation target for a given sectoral plan
347
What plans and strategies are mentioned pertaining to Waste Sector ?
Sectoral plans on
While the first NDC had a waste sector target of completing technical studies for a waste to energy (WTE) plant, due to shifts in the sector, the DOE will be undertaking technical studies to assess the feasibility of a WTE plant. The updated NDC includes a waste sector target to develop a circular economy policy and regulations.
Waste
Antigua and Barbuda
{ "answer_start": [ 15 ], "text": [ "waste to energy (wte) plant" ] }
First NDC
ATG
Waste-to-Energy
train
Information on sectoral plans
348
What are the Adaptation action/priority for the Economy-wide Sector?
Action and priority
Building Code updated and passed into law in line with a climate resilient development pathway including, inter alia, a requirement that all new homes built after 2025 have back-up renewable energy generation and storage systems. 2025. 2015 (Updated in 2021). Conditional. 7.
Economy-wide
Antigua and Barbuda
{ "answer_start": [ 1 ], "text": [ "code updated and passed into law in line with a climate resilient development pathway including, inter alia, a requirement that all new homes built after 2025 have back-up renewable energy generation and storage systems. 2025. 2015 (updated" ] }
Revised First NDC
ATG
Economy-wide: General
train
Adaptation action/priority
349
Which subsector forms part of global climate change adaptation subsector in Economy-wide Sector ?
Adapt Now subsector
This NDC set targets for low emission, and for building resilience at economy wide levels, including in the financial sector. The targets set are based on science and meeting a 1.5-degree temperature goal. b.
Economy-wide
Antigua and Barbuda
{ "answer_start": [ 13 ], "text": [ "economy wide" ] }
Revised First NDC
ATG
Economy-wide: General
train
GCA_subsector
350
What are the Adaptation action/priority for the Energy Sector?
Action and priority
Building Code updated and passed into law in line with a climate resilient development pathway including, inter alia, a requirement that all new homes built after 2025 have back-up renewable energy generation and storage systems. 2025. 2015 (Updated in 2021). Conditional. 7.
Energy
Antigua and Barbuda
{ "answer_start": [ 1 ], "text": [ "code updated and passed into law in line with a climate resilient development pathway including, inter alia, a requirement that all new homes built after 2025 have back-up renewable energy generation and storage systems. 2025. 2015 (updated" ] }
Revised First NDC
ATG
Renewable energy
train
Adaptation action/priority
351
What are the Adaptation action/priority for the Energy Sector?
Action and priority
100% education, health, food security, and emergency shelter facilities powered by their own grid-interactive renewable energy sources. 2030. 2015 (Updated in 2021). Conditional. 9.
Energy
Antigua and Barbuda
{ "answer_start": [ 2 ], "text": [ "education, health, food security, and emergency shelter facilities powered by their own grid-interactive renewable energy sources" ] }
Revised First NDC
ATG
Renewable energy
train
Adaptation action/priority
352
Which subsector forms part of global climate change adaptation subsector in Energy Sector ?
Adapt Now subsector
The proposed GCF Roads project will build on the existing Road Infrastructure Rehabilitation and Reconstruction Programme to increase the climate resilience of critical road infrastructure and utilities in Antigua and Barbuda. In particular, the proposed project will climate-proof four primary roads and their associated infrastructure as well as adapting target utilities to withstand the impacts of extreme climate events including Category 4 and 5 hurricanes, as well as climate- induced floods and droughts.
Energy
Antigua and Barbuda
{ "answer_start": [ 9, 19 ], "text": [ "existing road infrastructure", "climate resilience of critical road infrastructure" ] }
Revised First NDC
ATG
Renewable energy
train
GCA_subsector
353
Which subsector forms part of global climate change adaptation subsector in Energy Sector ?
Adapt Now subsector (2)
Through climate modelling, Antigua and Barbuda will predict future impacts of climate change and assess current and future risk from tropical cyclones (wind and storm surge), drought (increased temperatures and low precipitation), marine heat waves, and sea level rise. This data will form the basis of vulnerability risk assessments for sectoral adaptation plans that will help assess exposure to climate risks, climate- related hazards, and vulnerability to climate change the sectoral level.
Energy
Antigua and Barbuda
{ "answer_start": [ 66, 76 ], "text": [ "exposure to climate risks", "vulnerability to climate" ] }
Revised First NDC
ATG
Renewable energy
train
GCA_Subsector_2
354
What are the Adaptation action/priority for the Economy-wide Sector?
Action and priority
100% education, health, food security, and emergency shelter facilities powered by their own grid-interactive renewable energy sources. 2030. 2015 (Updated in 2021). Conditional. 9.
Economy-wide
Antigua and Barbuda
{ "answer_start": [ 2 ], "text": [ "education, health, food security, and emergency shelter facilities powered by their own grid-interactive renewable energy sources" ] }
Revised First NDC
ATG
Economy-wide: General
train
Adaptation action/priority
355
Which subsector forms part of global climate change adaptation subsector in Economy-wide Sector ?
Adapt Now subsector
The proposed GCF Roads project will build on the existing Road Infrastructure Rehabilitation and Reconstruction Programme to increase the climate resilience of critical road infrastructure and utilities in Antigua and Barbuda. In particular, the proposed project will climate-proof four primary roads and their associated infrastructure as well as adapting target utilities to withstand the impacts of extreme climate events including Category 4 and 5 hurricanes, as well as climate- induced floods and droughts.
Economy-wide
Antigua and Barbuda
{ "answer_start": [ 9, 19 ], "text": [ "existing road infrastructure", "climate resilience of critical road infrastructure" ] }
Revised First NDC
ATG
Economy-wide: General
val
GCA_subsector
356
Which subsector forms part of global climate change adaptation subsector in Economy-wide Sector ?
Adapt Now subsector (2)
Through climate modelling, Antigua and Barbuda will predict future impacts of climate change and assess current and future risk from tropical cyclones (wind and storm surge), drought (increased temperatures and low precipitation), marine heat waves, and sea level rise. This data will form the basis of vulnerability risk assessments for sectoral adaptation plans that will help assess exposure to climate risks, climate- related hazards, and vulnerability to climate change the sectoral level.
Economy-wide
Antigua and Barbuda
{ "answer_start": [ 66, 76 ], "text": [ "exposure to climate risks", "vulnerability to climate" ] }
Revised First NDC
ATG
Economy-wide: General
test
GCA_Subsector_2
357
What are the Adaptation action/priority for the Energy Sector?
Action and priority
Given the projected increase in the frequency of Category 4 and 5 hurricanes and the vulnerability of the energy system to these extreme events, Antigua and Barbuda plans to expand the use of renewable energy within household back up energy systems. This is in line with the adaptation target of 30,000 homes or 50% of pre-2020 homes to have back-up renewable energy systems for at least 4–6 hours of energy.
Energy
Antigua and Barbuda
{ "answer_start": [ 34, 53 ], "text": [ "renewable energy within household back up energy systems", "homes or 50% of pre-2020 homes to have back-up renewable energy systems for at least 4–6 hours of energy" ] }
Revised First NDC
ATG
Renewable energy
train
Adaptation action/priority
358
Which subsector forms part of global climate change adaptation subsector in Energy Sector ?
Adapt Now subsector
Table 4: Pipeline of Priority Projects in the GCF Country Programme (2020). #. Project Title. Description. 1. A Blueprint for adapting road infrastructure to projected climate extremes in Antigua and Barbuda. The proposed GCF Roads project will build on the existing Road Infrastructure Rehabilitation and Reconstruction Programme to increase the climate resilience of critical road infrastructure and utilities in Antigua and Barbuda.
Energy
Antigua and Barbuda
{ "answer_start": [ 30, 49, 59 ], "text": [ "infrastructure to projected climate", "existing road infrastructure", "climate resilience of critical road infrastructure" ] }
Revised First NDC
ATG
Renewable energy
train
GCA_subsector
359
What are the Adaptation action/priority for the Environment Sector?
Action and priority
All waterways are protected to reduce the risks of flooding and health impacts. 2030. 2015. Conditional. Targets to support social inclusion, gender and reduce transitional risks. Just Transition. 12.
Environment
Antigua and Barbuda
{ "answer_start": [ 1, 28 ], "text": [ "waterways are protected to reduce the risks of flooding and health impacts", "reduce transitional risks" ] }
Revised First NDC
ATG
Watershed and river basin management
train
Adaptation action/priority
360
Which subsector forms part of global climate change adaptation subsector in Environment Sector ?
Adapt Now subsector
Adaptation planning at the Local Area Planning (LAP) scale (i.e., community and parish level), as well will help the GoAB understand the spatial distribution and quantification of catastrophe risk in a changing climate at a local scale. The GoAB also intends to implement regulations, which recognise the need for the integration of risk information into the adaptation planning framework.
Environment
Antigua and Barbuda
{ "answer_start": [ 37 ], "text": [ "changing climate" ] }
Revised First NDC
ATG
Watershed and river basin management
train
GCA_subsector
361
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector (2)
Antigua and Barbuda National Greenhouse Gas Reduction Report↩. IRENA. (2021). Antigua and Barbuda: Renewable energy roadmap, International Renewable Energy Agency, Abu Dhabi. https://irena.org/publications/2021/March/Antigua-and-Barbuda-Renewable-Energy-Roadmap. Accessed 17 Mar. 2021.↩. Global Green Growth Institute. (2021c). Policy Guide to Inclusive Investment Opportunities in Renewable Energy in Antigua and Barbuda 2020-2025.↩. Department of Environment. (2020b).
Environment
Antigua and Barbuda
{ "answer_start": [ 20 ], "text": [ "renewable energy roadmap, international renewable energy" ] }
Revised First NDC
ATG
Watershed and river basin management
train
GCA_Sector_2
362
Which subsector forms part of global climate change adaptation subsector in Environment Sector ?
Adapt Now subsector (2)
All waterways are protected to reduce the risks of flooding and health impacts. 2030. 2015. Conditional. Targets to support social inclusion, gender and reduce transitional risks. Just Transition. 12.
Environment
Antigua and Barbuda
{ "answer_start": [ 7 ], "text": [ "risks of flooding and health" ] }
Revised First NDC
ATG
Watershed and river basin management
test
GCA_Subsector_2
363
What are the Adaptation action/priority for the Health Sector?
Action and priority
All waterways are protected to reduce the risks of flooding and health impacts. 2030. 2015. Conditional. Targets to support social inclusion, gender and reduce transitional risks. Just Transition. 12.
Health
Antigua and Barbuda
{ "answer_start": [ 1, 28 ], "text": [ "waterways are protected to reduce the risks of flooding and health impacts", "reduce transitional risks" ] }
Revised First NDC
ATG
Health: General
train
Adaptation action/priority
364
Which subsector forms part of global climate change adaptation subsector in Health Sector ?
Adapt Now subsector
Adaptation planning at the Local Area Planning (LAP) scale (i.e., community and parish level), as well will help the GoAB understand the spatial distribution and quantification of catastrophe risk in a changing climate at a local scale. The GoAB also intends to implement regulations, which recognise the need for the integration of risk information into the adaptation planning framework.
Health
Antigua and Barbuda
{ "answer_start": [ 37 ], "text": [ "changing climate" ] }
Revised First NDC
ATG
Health: General
train
GCA_subsector
365
Which Sector forms part of global climate change adaptation sector ?
Adapt Now sector (2)
With the increased frequency of droughts because of climate change, there is need for an integrated approach to use available best practises for water generation, water capture, distribution, storage, and reuse, while respecting the natural balance of water needs for the forest and natural ecosystem systems and sectors such as farming. The project is to ensure consistent water supply for the people of Antigua and Barbuda.
Health
Antigua and Barbuda
{ "answer_start": [ 24, 64 ], "text": [ "water generation, water", "water supply" ] }
Revised First NDC
ATG
Health: General
train
GCA_Sector_2
366
Which subsector forms part of global climate change adaptation subsector in Health Sector ?
Adapt Now subsector (2)
All waterways are protected to reduce the risks of flooding and health impacts. 2030. 2015. Conditional. Targets to support social inclusion, gender and reduce transitional risks. Just Transition. 12.
Health
Antigua and Barbuda
{ "answer_start": [ 7 ], "text": [ "risks of flooding and health" ] }
Revised First NDC
ATG
Health: General
train
GCA_Subsector_2
367
What are the Adaptation action/priority for the Water Sector?
Action and priority
2015 (Updated in 2021). Conditional. 7. 100% of the water supply infrastructure powered by their own grid-interactive renewable energy sources. 2030. 2015 (Updated in 2021). Conditional. 8. 100% education, health, food security, and emergency shelter facilities powered by their own grid-interactive renewable energy sources. 2030. 2015 (Updated in 2021). Conditional.
Water
Antigua and Barbuda
{ "answer_start": [ 15, 55 ], "text": [ "water supply infrastructure powered by their own grid-interactive renewable energy sources", "powered by their own grid-interactive renewable energy sources" ] }
Revised First NDC
ATG
Infrastructure
train
Adaptation action/priority
368
Which subsector forms part of global climate change adaptation subsector in Water Sector ?
Adapt Now subsector
With the increased frequency of droughts because of climate change, there is need for an integrated approach to use available best practises for water generation, water capture, distribution, storage, and reuse, while respecting the natural balance of water needs for the forest and natural ecosystem systems and sectors such as farming. The project is to ensure consistent water supply for the people of Antigua and Barbuda.
Water
Antigua and Barbuda
{ "answer_start": [ 24 ], "text": [ "water generation, water" ] }
Revised First NDC
ATG
Infrastructure
train
GCA_subsector
369
What are the Adaptation action/priority for the Energy Sector?
Action and priority
2015 (Updated in 2021). Conditional. 7. 100% of the water supply infrastructure powered by their own grid-interactive renewable energy sources. 2030. 2015 (Updated in 2021). Conditional. 8. 100% education, health, food security, and emergency shelter facilities powered by their own grid-interactive renewable energy sources. 2030. 2015 (Updated in 2021). Conditional.
Energy
Antigua and Barbuda
{ "answer_start": [ 15, 55 ], "text": [ "water supply infrastructure powered by their own grid-interactive renewable energy sources", "powered by their own grid-interactive renewable energy sources" ] }
Revised First NDC
ATG
Renewable energy
test
Adaptation action/priority
370
Which subsector forms part of global climate change adaptation subsector in Energy Sector ?
Adapt Now subsector
This project is designed to enhance the financing and management of protected areas through innovations in renewable energy capacity and arrangements. Global Environmental Facility. In Implementation. 7. Transformation of the Water and Government Sectors using Renewable Energy.
Energy
Antigua and Barbuda
{ "answer_start": [ 34 ], "text": [ "water and government sectors using renewable energy" ] }
Revised First NDC
ATG
Renewable energy
train
GCA_subsector
371
What are the Adaptation action/priority for the Water Sector?
Action and priority
100% of community and sports infrastructure and assets are climate resilient (to withstand at a minimum Category 4 tropical cyclones) and have adequate water harvesting and storage system. 2030. 2021. Conditional. 10.
Water
Antigua and Barbuda
{ "answer_start": [ 3 ], "text": [ "community and sports infrastructure and assets are climate resilient (to withstand at a minimum category 4 tropical cyclones) and have adequate water harvesting and storage system" ] }
Revised First NDC
ATG
Infrastructure
val
Adaptation action/priority
372
Which subsector forms part of global climate change adaptation subsector in Water Sector ?
Adapt Now subsector
Antigua and Barbuda acknowledges the importance of equity and inclusivity in energy transition and is committed to establishing socially inclusive, gender responsive and accessible investment opportunities in renewable energy through an Inclusive Renewable Energy Strategy.30 The aim is to integrate international and regional standards for equitable investment opportunities for its citizens of different gender, people with disabilities, and youth, as well as those households in economic hardship, and MSMEs. Inclusive renewable energy is also a vehicle for entrepreneurship opportunities and households, lowers the cost of energy and can improve livelihoods.
Water
Antigua and Barbuda
{ "answer_start": [ 28, 75 ], "text": [ "renewable energy through an inclusive renewable energy", "inclusive renewable energy" ] }
Revised First NDC
ATG
Infrastructure
train
GCA_subsector
373
What are the Adaptation action/priority for the Economy-wide Sector?
Action and priority
100% of community and sports infrastructure and assets are climate resilient (to withstand at a minimum Category 4 tropical cyclones) and have adequate water harvesting and storage system. 2030. 2021. Conditional. 10.
Economy-wide
Antigua and Barbuda
{ "answer_start": [ 3 ], "text": [ "community and sports infrastructure and assets are climate resilient (to withstand at a minimum category 4 tropical cyclones) and have adequate water harvesting and storage system" ] }
Revised First NDC
ATG
Economy-wide: General
train
Adaptation action/priority
374
Which subsector forms part of global climate change adaptation subsector in Economy-wide Sector ?
Adapt Now subsector
Antigua and Barbuda acknowledges the importance of equity and inclusivity in energy transition and is committed to establishing socially inclusive, gender responsive and accessible investment opportunities in renewable energy through an Inclusive Renewable Energy Strategy.30 The aim is to integrate international and regional standards for equitable investment opportunities for its citizens of different gender, people with disabilities, and youth, as well as those households in economic hardship, and MSMEs. Inclusive renewable energy is also a vehicle for entrepreneurship opportunities and households, lowers the cost of energy and can improve livelihoods.
Economy-wide
Antigua and Barbuda
{ "answer_start": [ 28, 75 ], "text": [ "renewable energy through an inclusive renewable energy", "inclusive renewable energy" ] }
Revised First NDC
ATG
Economy-wide: General
train
GCA_subsector
375
What plans and strategies are mentioned pertaining to Waste Sector ?
Sectoral plans on
100% all new vehicle sales to be electric vehicles. 2030. 2021. Conditional. 3. Explore potential for emissions reductions in the waste sector. 2025. 2021. Conditional. 4. Explore potential for emissions reductions in the Agriculture, Forestry and Other Land Use (AFOLU) sector. 2030. 2021. Conditional.
Waste
Antigua and Barbuda
{ "answer_start": [ 20, 38 ], "text": [ "potential for emissions reductions in the waste sector", "potential for emissions reductions" ] }
Revised First NDC
ATG
Waste: General
train
Information on sectoral plans
376
What is the conditional part of mitigation target provided for the Waste Sector ?
Conditional part of mitigation target
100% all new vehicle sales to be electric vehicles. 2030. 2021. Conditional. 3. Explore potential for emissions reductions in the waste sector. 2025. 2021. Conditional. 4. Explore potential for emissions reductions in the Agriculture, Forestry and Other Land Use (AFOLU) sector. 2030. 2021. Conditional.
Waste
Antigua and Barbuda
{ "answer_start": [ 20, 38 ], "text": [ "potential for emissions reductions in the waste sector", "potential for emissions reductions" ] }
Revised First NDC
ATG
Waste: General
val
Conditional part of mitigation target for a given sectoral plan
377
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ?
Sectoral targets on
2030. e) 100% renewable energy generation for all government operations. 2030. f) 100% of fixtures and appliances in government buildings will be energy efficient. 2030. g) Elimination of the fuel surcharge tax on electricity bills.
Energy
Antigua and Barbuda
{ "answer_start": [ 7, 21 ], "text": [ "energy generation for all government operations. 2030", "fixtures and appliances in government buildings will be energy efficient. 2030" ] }
Revised First NDC
ATG
Demand-side Efficiency: Appliances
train
Targets at the sectoral level
378
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ?
Conditional part of mitigation target
2030. e) 100% renewable energy generation for all government operations. 2030. f) 100% of fixtures and appliances in government buildings will be energy efficient. 2030. g) Elimination of the fuel surcharge tax on electricity bills.
Energy
Antigua and Barbuda
{ "answer_start": [ 7, 21 ], "text": [ "energy generation for all government operations. 2030", "fixtures and appliances in government buildings will be energy efficient. 2030" ] }
Revised First NDC
ATG
Demand-side Efficiency: Appliances
train
Conditional part of the mitigation target for a given sectoral target
379
What upstream policies and strategies are mentioned in Energy Sector ?
Upstream policies on
a) Enhance the established enabling legal, policy and institutional environment for a low carbon emission development pathway to achieve poverty reduction and sustainable development. None. 2015. Unconditional. b) Establish efficiency standards for the importation of all appliances. 2020. 2015. Conditional.
Energy
Antigua and Barbuda
{ "answer_start": [ 36 ], "text": [ "efficiency standards for the importation of all appliances" ] }
Revised First NDC
ATG
Demand-side Efficiency: Appliances
train
Information on upstream policies for a given sector
380
What is the conditional part of mitigation target provided for upstream plans and strategies in the Energy Sector ?
Conditional part of mitigation target
a) Enhance the established enabling legal, policy and institutional environment for a low carbon emission development pathway to achieve poverty reduction and sustainable development. None. 2015. Unconditional. b) Establish efficiency standards for the importation of all appliances. 2020. 2015. Conditional.
Energy
Antigua and Barbuda
{ "answer_start": [ 36 ], "text": [ "efficiency standards for the importation of all appliances" ] }
Revised First NDC
ATG
Demand-side Efficiency: Appliances
train
Conditional part of mitigation target for a given sectoral upstream policy
381
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ?
Sectoral targets on
2015 (Updated in 2021). Conditional. b) 50 MW of renewable energy generation capacity owned by farmers who can sell electricity to off-takers. 2030. c) 100 MW of renewable energy generation capacity owned by social investment entities for (for e.g., Social Security Board, Medical Benefit Scheme, non-governmental organizations, faith-based organizations, community-based organization, taxi associations, bus associations, and other businesses registered as social investors).
Energy
Antigua and Barbuda
{ "answer_start": [ 12, 35 ], "text": [ "mw of renewable energy generation capacity owned by farmers who can sell electricity to off-takers", "mw of renewable energy generation capacity owned by social investment entities for (for e.g., social security board, medical benefit scheme, non-governmental organizations, faith-based organizations, community-based organization, taxi associations, bus associations, and other businesses registered as social investors" ] }
Revised First NDC
ATG
Renewable Energy
train
Targets at the sectoral level
382
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ?
Conditional part of mitigation target
2015 (Updated in 2021). Conditional. b) 50 MW of renewable energy generation capacity owned by farmers who can sell electricity to off-takers. 2030. c) 100 MW of renewable energy generation capacity owned by social investment entities for (for e.g., Social Security Board, Medical Benefit Scheme, non-governmental organizations, faith-based organizations, community-based organization, taxi associations, bus associations, and other businesses registered as social investors).
Energy
Antigua and Barbuda
{ "answer_start": [ 12, 35 ], "text": [ "mw of renewable energy generation capacity owned by farmers who can sell electricity to off-takers", "mw of renewable energy generation capacity owned by social investment entities for (for e.g., social security board, medical benefit scheme, non-governmental organizations, faith-based organizations, community-based organization, taxi associations, bus associations, and other businesses registered as social investors" ] }
Revised First NDC
ATG
Renewable Energy
train
Conditional part of the mitigation target for a given sectoral target
383
What adaptation/mitigation/net-zero targets/objectives are provided for the Transport Sector ?
Sectoral targets on
For the energy sector, the two main targets are - 86% renewable energy generation from local resources in the electricity sector by 2030 and 100% of new vehicle sales to be electric vehicles by 2030. While the transport sector target is set to be achieved by 2040, continuous actions will be taken starting 2025.
Transport
Antigua and Barbuda
{ "answer_start": [ 3, 22 ], "text": [ "sector, the two main targets", "sector by 2030 and 100% of new vehicle sales to be electric vehicles by 2030. while the transport sector target is set to be achieved by 2040, continuous actions will be taken starting" ] }
Revised First NDC
ATG
Vehicle Fleet
train
Targets at the sectoral level
384
What is the conditional part of mitigation target provided for targets/objectives in the Transport Sector ?
Conditional part of mitigation target
For the energy sector, the two main targets are - 86% renewable energy generation from local resources in the electricity sector by 2030 and 100% of new vehicle sales to be electric vehicles by 2030. While the transport sector target is set to be achieved by 2040, continuous actions will be taken starting 2025.
Transport
Antigua and Barbuda
{ "answer_start": [ 3, 22 ], "text": [ "sector, the two main targets", "sector by 2030 and 100% of new vehicle sales to be electric vehicles by 2030. while the transport sector target is set to be achieved by 2040, continuous actions will be taken starting" ] }
Revised First NDC
ATG
Vehicle Fleet
train
Conditional part of the mitigation target for a given sectoral target
385
What upstream policies and strategies are mentioned in Transport Sector ?
Upstream policies on
2021. Conditional. b) Ban on the importation of new internal combustion engine vehicles (with an indicative start year of 2025). 2030. c) 100% of government vehicles will be electric vehicles. 2035. d) Establish efficiency standards for the importation of all vehicles. 2020. 2015. Conditional. 4. Waste.
Transport
Antigua and Barbuda
{ "answer_start": [ 9, 34, 45 ], "text": [ "importation of new internal combustion engine vehicles (with an indicative start year", "vehicles will be electric vehicles", "efficiency standards for the importation of all vehicles" ] }
Revised First NDC
ATG
Vehicle Fleet
train
Information on upstream policies for a given sector
386
What is the conditional part of mitigation target provided for upstream plans and strategies in the Transport Sector ?
Conditional part of mitigation target
2021. Conditional. b) Ban on the importation of new internal combustion engine vehicles (with an indicative start year of 2025). 2030. c) 100% of government vehicles will be electric vehicles. 2035. d) Establish efficiency standards for the importation of all vehicles. 2020. 2015. Conditional. 4. Waste.
Transport
Antigua and Barbuda
{ "answer_start": [ 9, 34, 45 ], "text": [ "importation of new internal combustion engine vehicles (with an indicative start year", "vehicles will be electric vehicles", "efficiency standards for the importation of all vehicles" ] }
Revised First NDC
ATG
Vehicle Fleet
train
Conditional part of mitigation target for a given sectoral upstream policy
387
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ?
Sectoral targets on
2030. c) 100 MW of renewable energy generation capacity owned by social investment entities for (for e.g., Social Security Board, Medical Benefit Scheme, non-governmental organizations, faith-based organizations, community-based organization, taxi associations, bus associations, and other businesses registered as social investors). 2030. d) 20 MW of wind-powered energy generation. 2030. e) 100% renewable energy generation for all government operations.
Energy
Antigua and Barbuda
{ "answer_start": [ 5, 64, 79 ], "text": [ "mw of renewable energy generation", "mw of wind-powered energy generation", "energy generation" ] }
Revised First NDC
ATG
Renewable Energy: Wind
train
Targets at the sectoral level
388
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ?
Conditional part of mitigation target
2030. c) 100 MW of renewable energy generation capacity owned by social investment entities for (for e.g., Social Security Board, Medical Benefit Scheme, non-governmental organizations, faith-based organizations, community-based organization, taxi associations, bus associations, and other businesses registered as social investors). 2030. d) 20 MW of wind-powered energy generation. 2030. e) 100% renewable energy generation for all government operations.
Energy
Antigua and Barbuda
{ "answer_start": [ 5, 64, 79 ], "text": [ "mw of renewable energy generation", "mw of wind-powered energy generation", "energy generation" ] }
Revised First NDC
ATG
Renewable Energy: Wind
train
Conditional part of the mitigation target for a given sectoral target
389
What adaptation/mitigation/net-zero targets/objectives are provided for the Buildings Sector ?
Sectoral targets on
2030. e) 100% renewable energy generation for all government operations. 2030. f) 100% of fixtures and appliances in government buildings will be energy efficient. 2030. g) Elimination of the fuel surcharge tax on electricity bills.
Buildings
Antigua and Barbuda
{ "answer_start": [ 7, 21 ], "text": [ "energy generation for all government operations. 2030", "fixtures and appliances in government buildings will be energy efficient. 2030" ] }
Revised First NDC
ATG
Buildings: General
test
Targets at the sectoral level
390
What is the conditional part of mitigation target provided for targets/objectives in the Buildings Sector ?
Conditional part of mitigation target
2030. e) 100% renewable energy generation for all government operations. 2030. f) 100% of fixtures and appliances in government buildings will be energy efficient. 2030. g) Elimination of the fuel surcharge tax on electricity bills.
Buildings
Antigua and Barbuda
{ "answer_start": [ 7, 21 ], "text": [ "energy generation for all government operations. 2030", "fixtures and appliances in government buildings will be energy efficient. 2030" ] }
Revised First NDC
ATG
Buildings: General
train
Conditional part of the mitigation target for a given sectoral target
391
What adaptation/mitigation/net-zero targets/objectives are provided for the Energy Sector ?
Sectoral targets on
2030. e) 100% renewable energy generation for all government operations. 2030. f) 100% of fixtures and appliances in government buildings will be energy efficient. 2030. g) Elimination of the fuel surcharge tax on electricity bills.
Energy
Antigua and Barbuda
{ "answer_start": [ 7, 21 ], "text": [ "energy generation for all government operations. 2030", "fixtures and appliances in government buildings will be energy efficient. 2030" ] }
Revised First NDC
ATG
Demand-side Efficiency: Buildings
train
Targets at the sectoral level
392
What is the conditional part of mitigation target provided for targets/objectives in the Energy Sector ?
Conditional part of mitigation target
2030. e) 100% renewable energy generation for all government operations. 2030. f) 100% of fixtures and appliances in government buildings will be energy efficient. 2030. g) Elimination of the fuel surcharge tax on electricity bills.
Energy
Antigua and Barbuda
{ "answer_start": [ 0, 21 ], "text": [ "2030. e) 100% renewable energy generation for all government operations. 2030", "fixtures and appliances in government buildings will be energy efficient. 2030" ] }
Revised First NDC
ATG
Demand-side Efficiency: Buildings
test
Conditional part of the mitigation target for a given sectoral target
393
What upstream policies and strategies are mentioned in Energy Sector ?
Upstream policies on
a) Enhance the established enabling legal, policy and institutional environment for a low carbon emission development pathway to achieve poverty reduction and sustainable development. None. 2015. Unconditional. b) Establish efficiency standards for the importation of all appliances. 2020. 2015. Conditional.
Energy
Antigua and Barbuda
{ "answer_start": [ 4 ], "text": [ "established enabling legal, policy and institutional environment for a low carbon emission development pathway to achieve poverty reduction and sustainable development" ] }
Revised First NDC
ATG
Energy: General
test
Information on upstream policies for a given sector
394
What is the unconditional part of mitigation target provided for upstream plans and strategies in the Energy Sector ?
Unconditional part of mitigation target
a) Enhance the established enabling legal, policy and institutional environment for a low carbon emission development pathway to achieve poverty reduction and sustainable development. None. 2015. Unconditional. b) Establish efficiency standards for the importation of all appliances. 2020. 2015. Conditional.
Energy
Antigua and Barbuda
{ "answer_start": [ 4 ], "text": [ "established enabling legal, policy and institutional environment for a low carbon emission development pathway to achieve poverty reduction and sustainable development" ] }
Revised First NDC
ATG
Energy: General
train
Unconditional part of mitigation target for a given upstream sectoral policy
395
What is the conditional part of mitigation target provided for upstream plans and strategies in the Energy Sector ?
Conditional part of mitigation target
2030. e) 100% renewable energy generation for all government operations. 2030. f) 100% of fixtures and appliances in government buildings will be energy efficient. 2030. g) Elimination of the fuel surcharge tax on electricity bills.
Energy
Antigua and Barbuda
{ "answer_start": [ 39 ], "text": [ "fuel surcharge tax on electricity bills" ] }
Revised First NDC
ATG
Energy: General
train
Conditional part of mitigation target for a given sectoral upstream policy
396
What plans and strategies are mentioned pertaining to Energy Sector ?
Sectoral plans on
2030. h) Finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant. 2025. 2015. Conditional. 3. Transport. a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional.
Energy
Antigua and Barbuda
{ "answer_start": [ 6 ], "text": [ "technical studies with the intention to construct and operationalize a waste to energy (wte) plant" ] }
Revised First NDC
ATG
Renewable Energy: Waste-to-Energy
train
Information on sectoral plans
397
What is the conditional part of mitigation target provided for the Energy Sector ?
Conditional part of mitigation target
2030. h) Finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant. 2025. 2015. Conditional. 3. Transport. a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional.
Energy
Antigua and Barbuda
{ "answer_start": [ 6 ], "text": [ "technical studies with the intention to construct and operationalize a waste to energy (wte) plant" ] }
Revised First NDC
ATG
Renewable Energy: Waste-to-Energy
train
Conditional part of mitigation target for a given sectoral plan
398
What plans and strategies are mentioned pertaining to Waste Sector ?
Sectoral plans on
2030. h) Finalize the technical studies with the intention to construct and operationalize a waste to energy (WTE) plant. 2025. 2015. Conditional. 3. Transport. a) Change fiscal policies on fossil fuel by 2025 to enable the transition to 100% renewable energy generation in the transportation sector. 2025. 2021. Conditional.
Waste
Antigua and Barbuda
{ "answer_start": [ 6 ], "text": [ "technical studies with the intention to construct and operationalize a waste to energy (wte) plant" ] }
Revised First NDC
ATG
Waste-to-Energy
val
Information on sectoral plans
399