text
stringlengths 1.39k
1.4k
|
---|
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.03 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.04, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 218.23 , Clean gas temperature after demister is 18.93 , AG element 1 is open with a value of 99.24 , AG element 2 is open with a value of 98.64 , AG element 3 is open with a value of 98.32 , High pressure network Blast Furnace gas flow rate is 20.68 , cold water supply pressure is 0.01 , cold water supply temperature is 31.68 , Hydraulic oil Temperature is 33.11 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.49" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.03 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.04, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 218.01 , Clean gas temperature after demister is 18.93 , AG element 1 is open with a value of 99.24 , AG element 2 is open with a value of 98.63 , AG element 3 is open with a value of 98.32 , High pressure network Blast Furnace gas flow rate is 20.65 , cold water supply pressure is 0.01 , cold water supply temperature is 31.63 , Hydraulic oil Temperature is 33.07 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.53" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.03 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.03, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 217.95 , Clean gas temperature after demister is 18.86 , AG element 1 is open with a value of 99.24 , AG element 2 is open with a value of 98.63 , AG element 3 is open with a value of 98.32 , High pressure network Blast Furnace gas flow rate is 20.69 , cold water supply pressure is 0.01 , cold water supply temperature is 31.57 , Hydraulic oil Temperature is 33.04 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.54" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.03 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 217.95 , Clean gas temperature after demister is 18.75 , AG element 1 is open with a value of 99.23 , AG element 2 is open with a value of 98.63 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.68 , cold water supply pressure is 0.01 , cold water supply temperature is 31.51 , Hydraulic oil Temperature is 33.02 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.56" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.03 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 218.33 , Clean gas temperature after demister is 18.59 , AG element 1 is open with a value of 99.24 , AG element 2 is open with a value of 98.63 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.72 , cold water supply pressure is 0.01 , cold water supply temperature is 31.44 , Hydraulic oil Temperature is 32.99 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.21" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.03 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 219.77 , Clean gas temperature after demister is 18.48 , AG element 1 is open with a value of 99.25 , AG element 2 is open with a value of 98.64 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.71 , cold water supply pressure is 0.01 , cold water supply temperature is 31.38 , Hydraulic oil Temperature is 32.94 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.13" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.02 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 221.06 , Clean gas temperature after demister is 18.5 , AG element 1 is open with a value of 99.29 , AG element 2 is open with a value of 98.66 , AG element 3 is open with a value of 98.35 , High pressure network Blast Furnace gas flow rate is 20.73 , cold water supply pressure is 0.01 , cold water supply temperature is 31.32 , Hydraulic oil Temperature is 32.9 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.12" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.02 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.94 , Clean gas temperature after demister is 18.42 , AG element 1 is open with a value of 99.28 , AG element 2 is open with a value of 98.66 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.75 , cold water supply pressure is 0.01 , cold water supply temperature is 31.24 , Hydraulic oil Temperature is 32.86 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.9 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.14" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.02 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.5 , Clean gas temperature after demister is 18.21 , AG element 1 is open with a value of 99.29 , AG element 2 is open with a value of 98.66 , AG element 3 is open with a value of 98.35 , High pressure network Blast Furnace gas flow rate is 20.76 , cold water supply pressure is 0.01 , cold water supply temperature is 31.19 , Hydraulic oil Temperature is 32.83 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.16" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.02 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 224.03 , Clean gas temperature after demister is 18.03 , AG element 1 is open with a value of 99.28 , AG element 2 is open with a value of 98.66 , AG element 3 is open with a value of 98.33 , High pressure network Blast Furnace gas flow rate is 20.72 , cold water supply pressure is 0.01 , cold water supply temperature is 31.13 , Hydraulic oil Temperature is 32.79 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.16" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.02 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 224.55 , Clean gas temperature after demister is 17.85 , AG element 1 is open with a value of 99.28 , AG element 2 is open with a value of 98.66 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.67 , cold water supply pressure is 0.01 , cold water supply temperature is 31.07 , Hydraulic oil Temperature is 32.75 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.89 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.12" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.02 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.67 , Clean gas temperature after demister is 17.85 , AG element 1 is open with a value of 99.28 , AG element 2 is open with a value of 98.67 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.7 , cold water supply pressure is 0.01 , cold water supply temperature is 31.0 , Hydraulic oil Temperature is 32.72 , Gas Scrubber is being operated at pressure of 0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.16" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.02 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.45 , Clean gas temperature after demister is 17.79 , AG element 1 is open with a value of 99.28 , AG element 2 is open with a value of 98.67 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.67 , cold water supply pressure is 0.01 , cold water supply temperature is 30.93 , Hydraulic oil Temperature is 32.67 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.17" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.01 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.06 , Clean gas temperature after demister is 17.57 , AG element 1 is open with a value of 99.28 , AG element 2 is open with a value of 98.7 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.71 , cold water supply pressure is 0.01 , cold water supply temperature is 30.87 , Hydraulic oil Temperature is 32.63 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.16" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.01 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.41 , Clean gas temperature after demister is 17.45 , AG element 1 is open with a value of 99.28 , AG element 2 is open with a value of 98.7 , AG element 3 is open with a value of 98.35 , High pressure network Blast Furnace gas flow rate is 20.63 , cold water supply pressure is 0.01 , cold water supply temperature is 30.78 , Hydraulic oil Temperature is 32.6 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.18" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.29 , Clean gas temperature after demister is 17.45 , AG element 1 is open with a value of 99.28 , AG element 2 is open with a value of 98.7 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.67 , cold water supply pressure is 0.01 , cold water supply temperature is 30.71 , Hydraulic oil Temperature is 32.56 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.16" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.58 , Clean gas temperature after demister is 17.36 , AG element 1 is open with a value of 99.28 , AG element 2 is open with a value of 98.7 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.62 , cold water supply pressure is 0.01 , cold water supply temperature is 30.66 , Hydraulic oil Temperature is 32.5 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.16" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.17 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.55 , Clean gas temperature after demister is 17.27 , AG element 1 is open with a value of 99.28 , AG element 2 is open with a value of 98.7 , AG element 3 is open with a value of 98.35 , High pressure network Blast Furnace gas flow rate is 20.62 , cold water supply pressure is 0.01 , cold water supply temperature is 30.59 , Hydraulic oil Temperature is 32.47 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.17" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.14 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.38 , Clean gas temperature after demister is 17.01 , AG element 1 is open with a value of 99.27 , AG element 2 is open with a value of 98.7 , AG element 3 is open with a value of 98.33 , High pressure network Blast Furnace gas flow rate is 20.62 , cold water supply pressure is 0.01 , cold water supply temperature is 30.51 , Hydraulic oil Temperature is 32.42 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.19" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.0 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 94.99, Upstream blast furnace gas pressure control valve position 2 is 99.15 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.55 , Clean gas temperature after demister is 16.98 , AG element 1 is open with a value of 99.27 , AG element 2 is open with a value of 98.71 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.64 , cold water supply pressure is 0.01 , cold water supply temperature is 30.44 , Hydraulic oil Temperature is 32.39 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.19" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 94.99, Upstream blast furnace gas pressure control valve position 2 is 99.14 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.43 , Clean gas temperature after demister is 16.99 , AG element 1 is open with a value of 99.27 , AG element 2 is open with a value of 98.74 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.63 , cold water supply pressure is 0.01 , cold water supply temperature is 30.37 , Hydraulic oil Temperature is 32.33 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.2" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.36 , Clean gas temperature after demister is 16.84 , AG element 1 is open with a value of 99.27 , AG element 2 is open with a value of 98.74 , AG element 3 is open with a value of 98.33 , High pressure network Blast Furnace gas flow rate is 20.61 , cold water supply pressure is 0.01 , cold water supply temperature is 30.29 , Hydraulic oil Temperature is 32.3 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.19" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 94.99, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.42 , Clean gas temperature after demister is 16.74 , AG element 1 is open with a value of 99.27 , AG element 2 is open with a value of 98.74 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.64 , cold water supply pressure is 0.01 , cold water supply temperature is 30.22 , Hydraulic oil Temperature is 32.25 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.2" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.14 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.38 , Clean gas temperature after demister is 16.53 , AG element 1 is open with a value of 99.27 , AG element 2 is open with a value of 98.74 , AG element 3 is open with a value of 98.33 , High pressure network Blast Furnace gas flow rate is 20.61 , cold water supply pressure is 0.01 , cold water supply temperature is 30.17 , Hydraulic oil Temperature is 32.23 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.22" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.16 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.34 , Clean gas temperature after demister is 16.55 , AG element 1 is open with a value of 99.27 , AG element 2 is open with a value of 98.74 , AG element 3 is open with a value of 98.34 , High pressure network Blast Furnace gas flow rate is 20.63 , cold water supply pressure is 0.01 , cold water supply temperature is 30.09 , Hydraulic oil Temperature is 32.18 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.22" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.14 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.38 , Clean gas temperature after demister is 16.53 , AG element 1 is open with a value of 99.28 , AG element 2 is open with a value of 98.76 , AG element 3 is open with a value of 98.33 , High pressure network Blast Furnace gas flow rate is 20.59 , cold water supply pressure is 0.01 , cold water supply temperature is 30.02 , Hydraulic oil Temperature is 32.13 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.25" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.14 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.35 , Clean gas temperature after demister is 16.44 , AG element 1 is open with a value of 99.29 , AG element 2 is open with a value of 98.78 , AG element 3 is open with a value of 98.35 , High pressure network Blast Furnace gas flow rate is 20.6 , cold water supply pressure is 0.01 , cold water supply temperature is 29.94 , Hydraulic oil Temperature is 32.1 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.22" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.15 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.3 , Clean gas temperature after demister is 16.15 , AG element 1 is open with a value of 99.3 , AG element 2 is open with a value of 98.78 , AG element 3 is open with a value of 98.36 , High pressure network Blast Furnace gas flow rate is 20.59 , cold water supply pressure is 0.01 , cold water supply temperature is 29.88 , Hydraulic oil Temperature is 32.06 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.19" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 221.58 , Clean gas temperature after demister is 16.19 , AG element 1 is open with a value of 99.32 , AG element 2 is open with a value of 98.78 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.61 , cold water supply pressure is 0.01 , cold water supply temperature is 29.83 , Hydraulic oil Temperature is 32.02 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.21" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 221.46 , Clean gas temperature after demister is 16.17 , AG element 1 is open with a value of 99.32 , AG element 2 is open with a value of 98.78 , AG element 3 is open with a value of 98.39 , High pressure network Blast Furnace gas flow rate is 20.61 , cold water supply pressure is 0.01 , cold water supply temperature is 29.75 , Hydraulic oil Temperature is 31.98 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.24" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.06 , Clean gas temperature after demister is 16.03 , AG element 1 is open with a value of 99.31 , AG element 2 is open with a value of 98.77 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.66 , cold water supply pressure is 0.01 , cold water supply temperature is 29.68 , Hydraulic oil Temperature is 31.94 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.22" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.33 , Clean gas temperature after demister is 15.94 , AG element 1 is open with a value of 99.32 , AG element 2 is open with a value of 98.81 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.66 , cold water supply pressure is 0.01 , cold water supply temperature is 29.61 , Hydraulic oil Temperature is 31.9 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.24" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.86 , Clean gas pressure after demister is 222.48 , Clean gas temperature after demister is 15.91 , AG element 1 is open with a value of 99.3 , AG element 2 is open with a value of 98.81 , AG element 3 is open with a value of 98.39 , High pressure network Blast Furnace gas flow rate is 20.68 , cold water supply pressure is 0.01 , cold water supply temperature is 29.55 , Hydraulic oil Temperature is 31.84 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.28" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.45 , Clean gas temperature after demister is 15.92 , AG element 1 is open with a value of 99.3 , AG element 2 is open with a value of 98.81 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.64 , cold water supply pressure is 0.01 , cold water supply temperature is 29.49 , Hydraulic oil Temperature is 31.82 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.3" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 94.99, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.5 , Clean gas temperature after demister is 15.86 , AG element 1 is open with a value of 99.31 , AG element 2 is open with a value of 98.81 , AG element 3 is open with a value of 98.39 , High pressure network Blast Furnace gas flow rate is 20.65 , cold water supply pressure is 0.01 , cold water supply temperature is 29.43 , Hydraulic oil Temperature is 31.78 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.22" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.43 , Clean gas temperature after demister is 15.7 , AG element 1 is open with a value of 99.31 , AG element 2 is open with a value of 98.82 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.61 , cold water supply pressure is 0.01 , cold water supply temperature is 29.35 , Hydraulic oil Temperature is 31.74 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.22" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.05 , Clean gas temperature after demister is 15.82 , AG element 1 is open with a value of 99.32 , AG element 2 is open with a value of 98.81 , AG element 3 is open with a value of 98.39 , High pressure network Blast Furnace gas flow rate is 20.68 , cold water supply pressure is 0.01 , cold water supply temperature is 29.29 , Hydraulic oil Temperature is 31.71 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.25" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 94.99, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 221.41 , Clean gas temperature after demister is 15.83 , AG element 1 is open with a value of 99.31 , AG element 2 is open with a value of 98.84 , AG element 3 is open with a value of 98.39 , High pressure network Blast Furnace gas flow rate is 20.62 , cold water supply pressure is 0.01 , cold water supply temperature is 29.24 , Hydraulic oil Temperature is 31.67 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.22" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 221.48 , Clean gas temperature after demister is 15.63 , AG element 1 is open with a value of 99.3 , AG element 2 is open with a value of 98.85 , AG element 3 is open with a value of 98.39 , High pressure network Blast Furnace gas flow rate is 20.66 , cold water supply pressure is 0.01 , cold water supply temperature is 29.17 , Hydraulic oil Temperature is 31.62 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.28" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.97 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 221.52 , Clean gas temperature after demister is 15.65 , AG element 1 is open with a value of 99.3 , AG element 2 is open with a value of 98.85 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.68 , cold water supply pressure is 0.01 , cold water supply temperature is 29.12 , Hydraulic oil Temperature is 31.57 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.29" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 94.99, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 221.74 , Clean gas temperature after demister is 15.66 , AG element 1 is open with a value of 99.3 , AG element 2 is open with a value of 98.86 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.65 , cold water supply pressure is 0.01 , cold water supply temperature is 29.03 , Hydraulic oil Temperature is 31.55 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.28" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 221.73 , Clean gas temperature after demister is 15.67 , AG element 1 is open with a value of 99.3 , AG element 2 is open with a value of 98.86 , AG element 3 is open with a value of 98.39 , High pressure network Blast Furnace gas flow rate is 20.66 , cold water supply pressure is 0.01 , cold water supply temperature is 28.97 , Hydraulic oil Temperature is 31.5 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.31" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.32 , Clean gas temperature after demister is 15.72 , AG element 1 is open with a value of 99.3 , AG element 2 is open with a value of 98.85 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.66 , cold water supply pressure is 0.01 , cold water supply temperature is 28.92 , Hydraulic oil Temperature is 31.47 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.3" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.38 , Clean gas temperature after demister is 15.53 , AG element 1 is open with a value of 99.3 , AG element 2 is open with a value of 98.89 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.6 , cold water supply pressure is 0.01 , cold water supply temperature is 28.85 , Hydraulic oil Temperature is 31.42 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.26" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.32 , Clean gas temperature after demister is 15.44 , AG element 1 is open with a value of 99.31 , AG element 2 is open with a value of 98.89 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.61 , cold water supply pressure is 0.01 , cold water supply temperature is 28.79 , Hydraulic oil Temperature is 31.38 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.26" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.43 , Clean gas temperature after demister is 15.58 , AG element 1 is open with a value of 99.35 , AG element 2 is open with a value of 98.9 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.55 , cold water supply pressure is 0.01 , cold water supply temperature is 28.74 , Hydraulic oil Temperature is 31.33 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.25" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.97 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.45 , Clean gas temperature after demister is 15.52 , AG element 1 is open with a value of 99.34 , AG element 2 is open with a value of 98.89 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.57 , cold water supply pressure is 0.01 , cold water supply temperature is 28.68 , Hydraulic oil Temperature is 31.31 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.24" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.97 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 94.99, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.45 , Clean gas temperature after demister is 15.37 , AG element 1 is open with a value of 99.34 , AG element 2 is open with a value of 98.89 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.54 , cold water supply pressure is 0.01 , cold water supply temperature is 28.61 , Hydraulic oil Temperature is 31.25 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.24" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.96 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.45 , Clean gas temperature after demister is 15.3 , AG element 1 is open with a value of 99.35 , AG element 2 is open with a value of 98.89 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.53 , cold water supply pressure is 0.01 , cold water supply temperature is 28.56 , Hydraulic oil Temperature is 31.23 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.85 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.24" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.97 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.88 , Clean gas pressure after demister is 222.38 , Clean gas temperature after demister is 15.43 , AG element 1 is open with a value of 99.34 , AG element 2 is open with a value of 98.9 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.58 , cold water supply pressure is 0.01 , cold water supply temperature is 28.51 , Hydraulic oil Temperature is 31.18 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.87 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.28" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.96 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.86 , Clean gas pressure after demister is 222.4 , Clean gas temperature after demister is 15.42 , AG element 1 is open with a value of 99.34 , AG element 2 is open with a value of 98.92 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.58 , cold water supply pressure is 0.01 , cold water supply temperature is 28.44 , Hydraulic oil Temperature is 31.14 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.87 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.3" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.97 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.4 , Clean gas temperature after demister is 15.35 , AG element 1 is open with a value of 99.34 , AG element 2 is open with a value of 98.92 , AG element 3 is open with a value of 98.38 , High pressure network Blast Furnace gas flow rate is 20.59 , cold water supply pressure is 0.01 , cold water supply temperature is 28.4 , Hydraulic oil Temperature is 31.1 , Gas Scrubber is being operated at pressure of -0.0 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.87 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.3" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.96 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 94.99, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.49 , Clean gas temperature after demister is 15.22 , AG element 1 is open with a value of 99.35 , AG element 2 is open with a value of 98.92 , AG element 3 is open with a value of 98.39 , High pressure network Blast Furnace gas flow rate is 20.55 , cold water supply pressure is 0.01 , cold water supply temperature is 28.33 , Hydraulic oil Temperature is 31.07 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.33" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.96 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 94.99, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.6 , Clean gas temperature after demister is 15.32 , AG element 1 is open with a value of 99.35 , AG element 2 is open with a value of 98.93 , AG element 3 is open with a value of 98.4 , High pressure network Blast Furnace gas flow rate is 20.54 , cold water supply pressure is 0.01 , cold water supply temperature is 28.28 , Hydraulic oil Temperature is 31.04 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.85 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.35" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.96 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.5 , Clean gas temperature after demister is 15.3 , AG element 1 is open with a value of 99.34 , AG element 2 is open with a value of 98.92 , AG element 3 is open with a value of 98.42 , High pressure network Blast Furnace gas flow rate is 20.54 , cold water supply pressure is 0.01 , cold water supply temperature is 28.24 , Hydraulic oil Temperature is 31.0 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.86 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.27" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.96 , Downstream blast furnace gas pressure control valve position 2 is 99.98 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.38 , Clean gas temperature after demister is 15.28 , AG element 1 is open with a value of 99.35 , AG element 2 is open with a value of 98.92 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.54 , cold water supply pressure is 0.01 , cold water supply temperature is 28.19 , Hydraulic oil Temperature is 30.96 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.87 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.27" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.96 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.6 , Clean gas temperature after demister is 15.13 , AG element 1 is open with a value of 99.35 , AG element 2 is open with a value of 98.96 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.56 , cold water supply pressure is 0.01 , cold water supply temperature is 28.12 , Hydraulic oil Temperature is 30.93 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.87 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.28" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.96 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.62 , Clean gas temperature after demister is 15.27 , AG element 1 is open with a value of 99.35 , AG element 2 is open with a value of 98.96 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.54 , cold water supply pressure is 0.01 , cold water supply temperature is 28.07 , Hydraulic oil Temperature is 30.89 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.36" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.95 , Downstream blast furnace gas pressure control valve position 2 is 99.98 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.45 , Clean gas temperature after demister is 15.2 , AG element 1 is open with a value of 99.36 , AG element 2 is open with a value of 98.96 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.59 , cold water supply pressure is 0.01 , cold water supply temperature is 28.02 , Hydraulic oil Temperature is 30.85 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.38" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.95 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.32 , Clean gas temperature after demister is 15.18 , AG element 1 is open with a value of 99.38 , AG element 2 is open with a value of 98.96 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.57 , cold water supply pressure is 0.01 , cold water supply temperature is 27.96 , Hydraulic oil Temperature is 30.82 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.37" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.95 , Downstream blast furnace gas pressure control valve position 2 is 99.98 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.6 , Clean gas temperature after demister is 14.96 , AG element 1 is open with a value of 99.4 , AG element 2 is open with a value of 98.96 , AG element 3 is open with a value of 98.42 , High pressure network Blast Furnace gas flow rate is 20.6 , cold water supply pressure is 0.01 , cold water supply temperature is 27.91 , Hydraulic oil Temperature is 30.78 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.32" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.95 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.93 , Clean gas temperature after demister is 15.12 , AG element 1 is open with a value of 99.4 , AG element 2 is open with a value of 98.96 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.51 , cold water supply pressure is 0.01 , cold water supply temperature is 27.85 , Hydraulic oil Temperature is 30.74 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.34" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.96 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 224.44 , Clean gas temperature after demister is 15.11 , AG element 1 is open with a value of 99.38 , AG element 2 is open with a value of 99.01 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.55 , cold water supply pressure is 0.01 , cold water supply temperature is 27.79 , Hydraulic oil Temperature is 30.69 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.28" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.97 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.7 , Clean gas temperature after demister is 14.96 , AG element 1 is open with a value of 99.4 , AG element 2 is open with a value of 99.0 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.53 , cold water supply pressure is 0.01 , cold water supply temperature is 27.73 , Hydraulic oil Temperature is 30.66 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.29" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.57 , Clean gas temperature after demister is 14.96 , AG element 1 is open with a value of 99.39 , AG element 2 is open with a value of 99.01 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.55 , cold water supply pressure is 0.01 , cold water supply temperature is 27.69 , Hydraulic oil Temperature is 30.61 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.79 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.25" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.55 , Clean gas temperature after demister is 14.9 , AG element 1 is open with a value of 99.39 , AG element 2 is open with a value of 99.01 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.55 , cold water supply pressure is 0.01 , cold water supply temperature is 27.64 , Hydraulic oil Temperature is 30.57 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.3" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.13 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 224.1 , Clean gas temperature after demister is 14.95 , AG element 1 is open with a value of 99.39 , AG element 2 is open with a value of 99.01 , AG element 3 is open with a value of 98.44 , High pressure network Blast Furnace gas flow rate is 20.52 , cold water supply pressure is 0.01 , cold water supply temperature is 27.58 , Hydraulic oil Temperature is 30.55 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.33" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.0, Upstream blast furnace gas pressure control valve position 2 is 99.1 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 224.19 , Clean gas temperature after demister is 14.86 , AG element 1 is open with a value of 99.38 , AG element 2 is open with a value of 99.01 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.52 , cold water supply pressure is 0.01 , cold water supply temperature is 27.54 , Hydraulic oil Temperature is 30.51 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.3" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.98 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.01 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 224.43 , Clean gas temperature after demister is 14.65 , AG element 1 is open with a value of 99.39 , AG element 2 is open with a value of 99.04 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.56 , cold water supply pressure is 0.01 , cold water supply temperature is 27.5 , Hydraulic oil Temperature is 30.46 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.32" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.01 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 224.16 , Clean gas temperature after demister is 14.83 , AG element 1 is open with a value of 99.39 , AG element 2 is open with a value of 99.05 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.53 , cold water supply pressure is 0.01 , cold water supply temperature is 27.43 , Hydraulic oil Temperature is 30.43 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.81 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.26" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 49.99 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.01 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.51 , Clean gas temperature after demister is 14.82 , AG element 1 is open with a value of 99.4 , AG element 2 is open with a value of 99.05 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.5 , cold water supply pressure is 0.01 , cold water supply temperature is 27.39 , Hydraulic oil Temperature is 30.4 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.86 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.32" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.02 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.04 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.58 , Clean gas temperature after demister is 14.69 , AG element 1 is open with a value of 99.41 , AG element 2 is open with a value of 99.05 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.53 , cold water supply pressure is 0.01 , cold water supply temperature is 27.34 , Hydraulic oil Temperature is 30.37 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.88 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.39" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.02 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.14 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.45 , Clean gas temperature after demister is 14.6 , AG element 1 is open with a value of 99.43 , AG element 2 is open with a value of 99.05 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.52 , cold water supply pressure is 0.01 , cold water supply temperature is 27.31 , Hydraulic oil Temperature is 30.33 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.37" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.14 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.41 , Clean gas temperature after demister is 14.66 , AG element 1 is open with a value of 99.44 , AG element 2 is open with a value of 99.05 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.51 , cold water supply pressure is 0.01 , cold water supply temperature is 27.25 , Hydraulic oil Temperature is 30.28 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.25" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.21 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.64 , Clean gas temperature after demister is 14.68 , AG element 1 is open with a value of 99.43 , AG element 2 is open with a value of 99.05 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.56 , cold water supply pressure is 0.01 , cold water supply temperature is 27.21 , Hydraulic oil Temperature is 30.25 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.85 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.34" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.22 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.8 , Clean gas temperature after demister is 14.56 , AG element 1 is open with a value of 99.43 , AG element 2 is open with a value of 99.09 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.54 , cold water supply pressure is 0.01 , cold water supply temperature is 27.17 , Hydraulic oil Temperature is 30.22 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.84 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.28" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.06 , Downstream blast furnace gas pressure control valve position 1 is 50.21 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 224.38 , Clean gas temperature after demister is 14.49 , AG element 1 is open with a value of 99.43 , AG element 2 is open with a value of 99.09 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.5 , cold water supply pressure is 0.01 , cold water supply temperature is 27.13 , Hydraulic oil Temperature is 30.17 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.85 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.34" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.22 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 224.56 , Clean gas temperature after demister is 14.54 , AG element 1 is open with a value of 99.43 , AG element 2 is open with a value of 99.1 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.51 , cold water supply pressure is 0.01 , cold water supply temperature is 27.11 , Hydraulic oil Temperature is 30.14 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.86 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.31" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.27 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 224.0 , Clean gas temperature after demister is 14.57 , AG element 1 is open with a value of 99.44 , AG element 2 is open with a value of 99.1 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.51 , cold water supply pressure is 0.01 , cold water supply temperature is 27.06 , Hydraulic oil Temperature is 30.1 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.86 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.4" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.33 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.52 , Clean gas temperature after demister is 14.45 , AG element 1 is open with a value of 99.44 , AG element 2 is open with a value of 99.1 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.51 , cold water supply pressure is 0.01 , cold water supply temperature is 27.02 , Hydraulic oil Temperature is 30.08 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.41" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.33 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.01, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 223.36 , Clean gas temperature after demister is 14.31 , AG element 1 is open with a value of 99.43 , AG element 2 is open with a value of 99.1 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.5 , cold water supply pressure is 0.01 , cold water supply temperature is 26.97 , Hydraulic oil Temperature is 30.02 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.83 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.35" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.33 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.87 , Clean gas pressure after demister is 222.63 , Clean gas temperature after demister is 14.33 , AG element 1 is open with a value of 99.42 , AG element 2 is open with a value of 99.12 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.52 , cold water supply pressure is 0.01 , cold water supply temperature is 26.93 , Hydraulic oil Temperature is 29.99 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.34" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.33 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.88 , Clean gas pressure after demister is 222.7 , Clean gas temperature after demister is 14.42 , AG element 1 is open with a value of 99.43 , AG element 2 is open with a value of 99.13 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.48 , cold water supply pressure is 0.01 , cold water supply temperature is 26.88 , Hydraulic oil Temperature is 29.96 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.82 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.26" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.36 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.85 , Clean gas pressure after demister is 223.17 , Clean gas temperature after demister is 14.34 , AG element 1 is open with a value of 99.43 , AG element 2 is open with a value of 99.13 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.5 , cold water supply pressure is 0.01 , cold water supply temperature is 26.84 , Hydraulic oil Temperature is 29.92 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.37" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.37 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 223.46 , Clean gas temperature after demister is 14.17 , AG element 1 is open with a value of 99.43 , AG element 2 is open with a value of 99.13 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.52 , cold water supply pressure is 0.01 , cold water supply temperature is 26.79 , Hydraulic oil Temperature is 29.87 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.23" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.37 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 223.46 , Clean gas temperature after demister is 14.2 , AG element 1 is open with a value of 99.43 , AG element 2 is open with a value of 99.13 , AG element 3 is open with a value of 98.43 , High pressure network Blast Furnace gas flow rate is 20.55 , cold water supply pressure is 0.01 , cold water supply temperature is 26.74 , Hydraulic oil Temperature is 29.85 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.21" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.37 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 223.55 , Clean gas temperature after demister is 14.24 , AG element 1 is open with a value of 99.45 , AG element 2 is open with a value of 99.13 , AG element 3 is open with a value of 98.44 , High pressure network Blast Furnace gas flow rate is 20.59 , cold water supply pressure is 0.01 , cold water supply temperature is 26.7 , Hydraulic oil Temperature is 29.8 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.3" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.37 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.21 , Downstream Blast furnace gas PCV 8104 is 99.79 , Clean gas pressure after demister is 223.58 , Clean gas temperature after demister is 14.16 , AG element 1 is open with a value of 99.44 , AG element 2 is open with a value of 99.13 , AG element 3 is open with a value of 98.46 , High pressure network Blast Furnace gas flow rate is 20.6 , cold water supply pressure is 0.01 , cold water supply temperature is 26.64 , Hydraulic oil Temperature is 29.78 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.23" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.45 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 223.55 , Clean gas temperature after demister is 14.01 , AG element 1 is open with a value of 99.44 , AG element 2 is open with a value of 99.15 , AG element 3 is open with a value of 98.47 , High pressure network Blast Furnace gas flow rate is 20.59 , cold water supply pressure is 0.01 , cold water supply temperature is 26.6 , Hydraulic oil Temperature is 29.73 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.27" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.09 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 223.76 , Clean gas temperature after demister is 14.09 , AG element 1 is open with a value of 99.45 , AG element 2 is open with a value of 99.15 , AG element 3 is open with a value of 98.47 , High pressure network Blast Furnace gas flow rate is 20.54 , cold water supply pressure is 0.01 , cold water supply temperature is 26.56 , Hydraulic oil Temperature is 29.69 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.79 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.34" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.1 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 223.95 , Clean gas temperature after demister is 14.19 , AG element 1 is open with a value of 99.45 , AG element 2 is open with a value of 99.15 , AG element 3 is open with a value of 98.47 , High pressure network Blast Furnace gas flow rate is 20.5 , cold water supply pressure is 0.01 , cold water supply temperature is 26.5 , Hydraulic oil Temperature is 29.66 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.44" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.09 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 223.8 , Clean gas temperature after demister is 14.04 , AG element 1 is open with a value of 99.45 , AG element 2 is open with a value of 99.16 , AG element 3 is open with a value of 98.47 , High pressure network Blast Furnace gas flow rate is 20.47 , cold water supply pressure is 0.01 , cold water supply temperature is 26.46 , Hydraulic oil Temperature is 29.63 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.39" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.09 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 224.05 , Clean gas temperature after demister is 14.06 , AG element 1 is open with a value of 99.45 , AG element 2 is open with a value of 99.16 , AG element 3 is open with a value of 98.47 , High pressure network Blast Furnace gas flow rate is 20.49 , cold water supply pressure is 0.01 , cold water supply temperature is 26.41 , Hydraulic oil Temperature is 29.59 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.79 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.35" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.08 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 223.64 , Clean gas temperature after demister is 14.05 , AG element 1 is open with a value of 99.46 , AG element 2 is open with a value of 99.15 , AG element 3 is open with a value of 98.47 , High pressure network Blast Furnace gas flow rate is 20.44 , cold water supply pressure is 0.01 , cold water supply temperature is 26.36 , Hydraulic oil Temperature is 29.55 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.79 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.36" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.08 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.79 , Clean gas pressure after demister is 224.48 , Clean gas temperature after demister is 14.07 , AG element 1 is open with a value of 99.45 , AG element 2 is open with a value of 99.19 , AG element 3 is open with a value of 98.47 , High pressure network Blast Furnace gas flow rate is 20.48 , cold water supply pressure is 0.01 , cold water supply temperature is 26.32 , Hydraulic oil Temperature is 29.52 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.79 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.32" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.09 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.03, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 224.45 , Clean gas temperature after demister is 14.04 , AG element 1 is open with a value of 99.45 , AG element 2 is open with a value of 99.2 , AG element 3 is open with a value of 98.47 , High pressure network Blast Furnace gas flow rate is 20.47 , cold water supply pressure is 0.01 , cold water supply temperature is 26.26 , Hydraulic oil Temperature is 29.46 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.44" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.09 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 224.6 , Clean gas temperature after demister is 13.88 , AG element 1 is open with a value of 99.45 , AG element 2 is open with a value of 99.2 , AG element 3 is open with a value of 98.47 , High pressure network Blast Furnace gas flow rate is 20.44 , cold water supply pressure is 0.01 , cold water supply temperature is 26.22 , Hydraulic oil Temperature is 29.43 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.33" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.08 , Downstream blast furnace gas pressure control valve position 2 is 99.99 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.79 , Clean gas pressure after demister is 224.65 , Clean gas temperature after demister is 13.99 , AG element 1 is open with a value of 99.45 , AG element 2 is open with a value of 99.2 , AG element 3 is open with a value of 98.47 , High pressure network Blast Furnace gas flow rate is 20.42 , cold water supply pressure is 0.01 , cold water supply temperature is 26.17 , Hydraulic oil Temperature is 29.39 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.8 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.32" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.09 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.2 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 224.6 , Clean gas temperature after demister is 13.94 , AG element 1 is open with a value of 99.45 , AG element 2 is open with a value of 99.2 , AG element 3 is open with a value of 98.47 , High pressure network Blast Furnace gas flow rate is 20.42 , cold water supply pressure is 0.01 , cold water supply temperature is 26.13 , Hydraulic oil Temperature is 29.37 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.79 , Recirculated water pressure is 0.32 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.31" |
"###Human:\nBlast Furnace Top gas Carbon monoxide percentage is 23.94,Blast Furnace Top gas Carbon dioxide percentage is 0.06 , Blast Furnace Top gas hydrogen percentage is 3.05 , Downstream blast furnace gas pressure control valve position 1 is 50.09 , Downstream blast furnace gas pressure control valve position 2 is 100.0 , Upstream blast furnace gas pressure control valve position 1 is 95.02, Upstream blast furnace gas pressure control valve position 2 is 99.21 , Downstream Blast furnace gas PCV 8104 is 99.8 , Clean gas pressure after demister is 224.47 , Clean gas temperature after demister is 13.86 , AG element 1 is open with a value of 99.45 , AG element 2 is open with a value of 99.2 , AG element 3 is open with a value of 98.47 , High pressure network Blast Furnace gas flow rate is 20.43 , cold water supply pressure is 0.01 , cold water supply temperature is 26.08 , Hydraulic oil Temperature is 29.32 , Gas Scrubber is being operated at pressure of -0.01 , Prescrubber water control valve position is 40.72 , Pump is discharging water at pressure of 0.79 , Recirculated water pressure is 0.31 , AG water tank level 1 is 1.47 , AG water tank level 2 is 1.41 , AG water tank level 3 is 2.24 , Inlet gas pressure in the scrubber is 600.0 , Water flow through AG Nozzles is 33.87 , Water Flow through Pre scrubber nozzle is 43.17\n\n### Assistant:\nPre Scrubber water level 3 is 6.29" |